APPLICATION / 02
Commercial site storage.
What should be in the brief?
The operating profile matters more than a headline capacity. Start with site data, the intended use and the grid connection.
02REQUEST INPUTS
These details help the next conversation become more specific. They are not a substitute for an engineering survey.
01
Interval load data and operating hours, if available
02
Site layout, connection point and equipment location
03
Project stage, target date and responsible EPC / installer
Do not have the data yet? Mark it as unknown. A project record should distinguish measured information from assumptions.